OUR CLIENTS
- Brasserie de Tahiti
- Electricité De Tahiti (EDT)
- Gaz de Tahiti (GDT)
- McDonald’s
- Marama Nui
- PETROPOL
- Polynésienne des Eaux (PDE)
- SARL REVA ITI
- SAS SOCIETE COMMERCIALE DE TAIARAPU
- SEML TE ORA NO ANANAHI
- SCI PAMATAI
- Société Tahitienne Des Oléoducs (STDO)
- SOMSTAT
- TOTAL Polynesia
- Transport d’Energie électrique en Polynésie (TEP)
TECHNICAL STUDIES AND PROJECT MANAGEMENT
SPEED has carried out numerous general or design studies in its various areas of expertise. In addition, as part of project management missions, many urban development projects or projects related to wastewater sanitation and sludge treatment, waste, drinking water, stormwater, and electricity have also been completed.
WATER
Wastewater Collection Network
- Collective wastewater sanitation for the city of PAPEETE: extension of collection networks in the PAOFAI (Toata and rue Destremeau) and FARE UTE (lanes M and L) sectors – Client: SEML te ora no ananahi – Project Cost: 280 M FCP – 2024 – ongoing
- First phase of collective wastewater sanitation works for PAPEETE/SIVU/ARUE and additional works – Client: SIVU TEPARENUI / Municipality of PAPEETE – Project Cost: 4,000 M FCP – 2025 (start of works)
- Extensions of the collective wastewater sanitation network of PAPEETE – PAOFAI (rue Cook, rue Destremeau) and FARE UTE (lanes M and L) – Client: SEML te ora no ananahi – Project Cost: 280 M FCP – 2022-2024
- Extensions of the collective wastewater sanitation network of the municipality of BORA BORA – Client: Municipality of BORA BORA – Project Cost: 162 M FCP – 2021-2022
- Collective wastewater sanitation for zone 1 FED of the city of Papeete: Full project management – Client: French Polynesia – Project Cost: 2,100 M FCP – 2017-2020
- Collective sanitation for the tourist area of Haapiti (connecting 220 users to the collective network of Haapiti): Full project management – Moorea-HAAPITI – Client: Municipality of HAAPITI – Project Cost: 440 M FCP – 2016 – 2022
- Collective wastewater sanitation for zone 1 A of the city of Papeete: Full project management – Papeete – Client: SEML te ora no ananahi – Project Cost: 1,300 M FCP – 2012 – 2016
- Collective wastewater sanitation for the southern plain of Punaauia: Full project management – Punaauia – Client: French Polynesia Ministry of the Environment, EDF funding – Project Cost: 1.6 Billion – 2007 – 2009
- Collective wastewater sanitation for Papeete – Zone 0: Full project management – Papeete – Client: Municipality of Papeete – Project Cost: 230 M – 2008 – 2009
- Collective wastewater sanitation for Moorea-Haapiti (1800 m3/day treatment plant, outfall, collection network): Full project management – Moorea-HAAPITI – Client: Ministry of the Environment, FREPF funding – Project Cost: 800 M – 2003 – 2005
Wastewater Treatment Plant
- Preliminary design for PAPEETE WWTP extension: APS, APD, and building permit file – PAPEETE – Client: SEML Te Ora No Ananahi – Project Cost: 2.15 Billion FCP – 2024
- Renovation of TIAPA PAEA WWTP: Rehabilitation of structures and modification of sludge treatment with reed beds – PAEA – Client: Municipality of PAEA – Project Cost: 36 M FCP – 2023-2024
- Renovation of VAIOPU WWTP: Rehabilitation of structures – PUNAAUIA – Client: OPH – Project Cost: 35 M FCP – 2022-2024
- Rehabilitation of PAPARA slaughterhouse WWTP: Project Management Assistance – Papara – Client: Department of Agriculture – Project Cost: 231.5 M FCP – 2018 – 2024
- TAAONE WWTPs: deconstruction of the Taaone WWTPs and creation of wastewater treatment devices and collection networks – Client: Defense Infrastructure Directorate of PAPEETE – Project Cost: 300 M – 2017
- Audit of OPH WWTPs (Tepapa, RHI Mamao) – Papeete – Client: OPH – Project Cost: 13 M – 2017
- PAPARA slaughterhouse WWTP: Feasibility study – Papara – Client: Rural Development Service – Project Cost: 231.5 M – 2016
- Papeete scalable Wastewater Treatment Plant 3,500 – 7,000 – 14,000 m3/day: Full project management – Papeete – Client: SEML TE ORA NO ANANAHI – Project Cost: 1.5 Billion – 2014 – 2016
- Renovation and improvement of the POVAI wastewater treatment plant: Full project management – Bora Bora – Client: Municipality of Bora Bora – Project Cost: 131 M – 2014 – 2016
- Project management assistance for the design-build of the PAPEETE central kitchen WWTP – Client: Municipality of PAPEETE – Project Cost: 80 M FCP – 2013-2014
- MAEVA NUI Shopping Center WWTP: Full project management – Taravao – Client: SCI Maeva – Project Cost: 25 M – 2012
- FARATEA Industrial Zone WWTP – 60 m3/day: Full project management – Taravao – Client: EAD – Project Cost: 90M – 2008 – 2009
- Outumaoro wastewater treatment plant (7000 m3/day), sludge and septic waste treatment – Punaauia – Client: Department of Public Works – Project Cost: 1.3 Billion – 1997 – 2003
- Collective wastewater sanitation for Bora Bora – north and east zones – 1,000 m3/day WWTP: Full project management – Client: Ministry of the Environment, EDF funding – Project Cost: 1.25 Billion – 2002 – 2005
Directional Drilling
- Wastewater sea outfall for zone 1 of PAPEETE: 400 m outfall in the lagoon and 300 m by drilling – Client: SEML te ora no ananahi – Project Cost: 400 M FCP – 2014-2016
- Connection of the future ferry terminal’s wastewater to the collective network of zone 0 in PAPEETE: Pressurized network installed via directional drilling – Client: SEML te ora no ananahi – Project Cost: 25 M FCP – 2011
General Studies
- Wastewater Sanitation Master Plan for the TEREHEAMANU Community of Communes – Client: TEREHEAMANU Community of Communes – Study Cost: 25 M FCP – 2022-2023
- Wastewater Sanitation Master Plan for HUAHINE – Client: Municipality of HUAHINE – Study Cost: 15 M FCP – 2021-2022
- Wastewater Sanitation Master Plan for PAEA – Client: Municipality of PAEA – Study Cost: 21 M FCP – 2021-2022
- Wastewater Sanitation Master Plan for RURUTU – Client: Municipality of RURUTU – Study Cost: 12 M FCP – 2021
- Wastewater Sanitation Master Plan for NUKU HIVA – Client: Municipality of NUKU HIVA – Project Cost: 18M – 2018 – 2021
- Wastewater Sanitation Master Plan for TEVA I UTA – Client: Municipality of TEVA I UTA – Project Cost: 13M – 2018 – 2020
- Project management assistance for the construction of the PAPARA slaughterhouse WWTP – Client: Ministry of the Green Economy – Study Cost: 10 M FCP – 2018-2024
- Study for the implementation of the SPANC (individual sanitation service) in BORA BORA – Client: Municipality of BORA BORA – Project Cost: 5M – 2018
- Study for the implementation of the SPANC in RURUTU – Client: Municipality of RURUTU – Project Cost: 2M – 2018
- Project management assistance for “Service provisions for the operation of collective wastewater sanitation in PAPEETE” – Client: SEML TE ORA NO ANANAHI – Project Cost: 6M – 2017
- Preliminary design for the extension of the collective sanitation network of BORA BORA – Client: Municipality of BORA BORA – Project Cost: 1.5M – 2017
- General Orientation Framework for wastewater sanitation in the PAPEETE urban area – Client: Ministry of Sustainable Development – Study Cost: 8 M FCP – 2005
- Drinking water supply master plan for the municipality of TAPUTAPUATEA (SPC) – 2019
- Project management for the PAREA production well – Client: Municipality of Huahine – Project Cost: 250 MF – 2019
- Assistance for updating the rate structure of the Papara water service – Client: EPIC VAIPU – Project Cost: N/A – 2019
- Technical assistance for TEPEPE wells – Client: Municipality of Huahine – Project Cost: N/A – 2019
- Project management for drinking water works (Phase 1 – Tranche 2 of short-term works of the ASDAEP) in the municipality of Paea – Client: Municipality of Paea – Project Cost: 250 MF – 2018
- Project management for groundwater research works – Client: Municipality of Moorea – Works cost: 30 MF
- Hydrological monitoring and techno-economic analysis for the exploitation of the Pic Vert watercourse – Client: Polynésienne des Eaux – Project Cost: N/A – 2018
- Source reconnaissance in the Maara sector – Client: Municipality of Paea – Project Cost: N/A – 2018
- Assistance for the renewal of the service provision contract for the water service – Client: Municipality of ARUE – Project Cost: N/A – 2018
- Project management for the renovation of the main pipes on Arii Paea Pomare avenue – Client: Municipality of Arue – Project Cost: 80 MF – 2018
- Project management for the Vaitupa and Papehue production wells – Client: Municipality of Paea – Project Cost: 140 MF – 2018
- Project management for the water supply works by drilling for the Atihiva housing development – Client: OPH – Works cost: 30 MF – 2018
- Modeling of the drinking water network of the municipality of Arue – Client: Municipality of Arue – Project Cost: N/A – 2018
- Feasibility study of a drainage gallery in Atimaono – Papara – Client: SPC – Project Cost: N/A – 2018
- Statistical processing of water service data – Client: Epic VAIPU – Project Cost: N/A – 2018
- Update of the drinking water master plan for the municipality of Bora Bora – Client: VAITEHI – Project Cost: N/A – 2018
- Update of the drinking water supply master plan for Papara – Study of the Temarua drainage gallery – Client: EPIC Vaipu – Project Cost: N/A – 2017
- Update of the drinking water supply master plan for Faaa – Client: Municipality of Faaa – Project Cost: N/A – 2017
- Preliminary design for the renovation of the TAPUTAPUATEA drinking water networks – Client: Municipality of Taputapuatea – Project Cost: 210 MF – 2017
- Diagnostic of the drinking water network of MAKEMO college – Client: General Directorate of Education and Teachings – Project Cost: N/A – 2017
- Project management for drinking water works (Phase 1 – Tranche 1 of short-term works of the ASDAEP) in the municipality of Paea (Municipality of Paea) – Works cost: 250 MF
- Project management for the 2016-2017 drinking water program, phase 1 – Municipality of Taiarapu Est – Client: Municipality of Taiarapu Est – Project Cost: 220 MF
- Preliminary design for the 2016-2017 drinking water program, phase 2 – Municipality of Taiarapu Est – Client: Municipality of Taiarapu Est – Project Cost: N/A – 2017
- Project management for the implementation of the short-term drinking water program in the municipality of Taiarapu Est – phase 3 potabilization – Client: Municipality of Taiarapu Est – Project Cost: 165 MF – 2017
- Creation of a production well at the Brasserie de Tahiti production site – Client: Brasserie de Tahiti – Project Cost: 50 MF – 2016
- Piloting of reconnaissance tests for the Tuauru drainage gallery – Client: Municipality of Mahina – Project Cost: N/A – 2016
- Update of the drinking water supply master plan for Mahina – Client: Municipality of Mahina – Project Cost: N/A – 2016
- Preliminary design for PAREA production wells – Client: Municipality of HUAHINE – Project Cost: N/A – 2016
- Project management for the renovation of the Hauti drinking water network – Client: Municipality of RURUTU – Project Cost: 100 MF – 2016
- Project management for new water resource research works in the municipality of Paea: well, drainage gallery, pseudo-drainage gallery – Client: Municipality of Paea – Project Cost: 60 MF – 2016
- Project management for the renewal of drinking water networks between the two bays of Moorea – Pihaena – Client: Municipality of Moorea – Project Cost: 240 MF – 2016
- Project management for the TUAURU drainage gallery – Client: Municipality of Mahina – Project Cost: 400 MF – 2016
- Pilot study on the exploitation of the freshwater lens of Motu Tevairoa – Client: Municipality of Bora Bora – Project Cost: N/A – 2016
- Preliminary design of the Tuauru drainage gallery – Client: Municipality of Mahina – Project Cost: N/A – 2016
- Study for new water resource research in Moorea – Client: Municipality of Moorea – Project Cost: N/A – 2016
- Update of the drinking water supply master plan for the municipality of Paea – Client: Municipality of Paea – Project Cost: N/A – 2016
- Exploitation of the HAAVAI wells in HUAHINE – Client: Municipality of HUAHINE – Project Cost: N/A – 2016
- Update of the drinking water supply master plan for the municipality of PAPARA – Client: EPIC Vaipu – Project Cost – 2016
- Diagnostic study of the drinking water network of the municipality of PAEA – Client: Municipality of Paea – Project Cost – 2016
- Study for the revision of drinking water pricing – Client: Municipality of ARUE – Project Cost – 2016
- Water resource balance for the Outumaoro sector – Client: TNAD – 2014
- Water research for the irrigation of the Presidency – Client: Presidency of French Polynesia – 2014
- Diagnostic of the seawater network of the Vairao Aquaculture Technical Center – Client: CTA – DRMM – 2014
- Project management for the supply and installation of water meters – Client: Municipality of Mahina – 2014
- Project management for the supply and installation of water meters – Client: Municipality of PAPARA – 2014
- Project management for the supply and installation of drinking water pipes – Client: Municipality of PAPARA – 2014
- Project management for the implementation of the short-term drinking water program in the municipality of Taiarapu Est – Client: Municipality of Taiarapu Est – 2014
- Project management for the hydro-agricultural development works of OPOA – ARATAO domain – Client: Municipality of Taputapuatea – 2014
- Preliminary design for the creation of the Urumaru well – Client: Polynésienne des Eaux – 2014
- Feasibility study for a pumping station to supply the Urumaru housing development – Client: Polynésienne des Eaux – 2014
- Project management for the supply and installation of pressure regulation devices on the drinking water network of the municipality of Pirae – Client: Municipality of Pirae – 2013
- Feasibility study related to the Tipaerui West water reservoirs – Client: Polynésienne des Eaux – 2013
- Training on the use of the EPANET hydraulic modeling software – Client: Municipality of Pirae, Polynésienne des Eaux, Vaitehi – 2013
- Assistance for the negotiation of the leasing contract for the drinking water service of the municipality of Pirae – Client: Municipality of Pirae – 2013
- Diagnostic of the water sector in French Polynesia and proposed orientations – Client: Ministry of the Environment – 2013
- Study for the implementation of an operating protocol for the Nuku Hiva airport water network – Client: Department of Public Works – 2013
- Preliminary summary design for the renovation of the drinking water network of the Erima Social housing development – Arue – Client: OPH – 2013
- Modeling of the drinking water network of the municipality of Papeete – Client: Polynésienne des Eaux – 2012
- Establishment of the tender documents for the operating services of the hydraulic service of the municipality of Arue – 2012
- Project management for the creation of wells in Terre Déserte – Client: Department of Public Works – 2011
- Pricing study – Client: Municipality of Arue – 2011
- Pricing study – Client: Municipality of Uturoa – 2011
- Drinking water production by reverse osmosis units – Client: Anaa – Faiate – 2010
- Update of OPH drinking water data in the municipality of Faa’a – Client: OPH – 2010
- Monitoring of pumping tests of the Maruia wells in the municipality of Papara – Client: SPEA – 2010
- Drinking water works in the Tamahana sector – Preliminary design – Client: Arue – 2010
- Report on the water of the city of Arue for the year 2009 – Client: Arue – 2010
- Technical assistance for leak detection and pipe repairs on the drinking water network of the municipality of Papara – Client: Papara – 2010
- Drinking water management report for the city of Arue – Client: Arue – 2009
- Full project management for the renovation of the Uturoa city center drinking water network – Client: Uturoa
- Technical assistance for drinking water – Client: Arue – 2009
- Preliminary design study for the replacement of the Faanui reverse osmosis units – Client: Vaitehi – 2009
- Sizing study of the Moorea drinking water network – Hydraulic modeling – Client: SPEA – 2009
- Modeling of the drinking water network of the Tipaerui valley in Papeete – Client: SPEA – 2009
- Hydrogeological study of the freshwater lens of Motu Tevairoa – Client: Municipality of Bora Bora – 2008
- Full project management for the installation of terrestrial networks related to the Faratea bio-marine activity hub – Client: EAD – 2008
- Study of the supply conditions for the Taravao housing project – Client: EGT – 2008
- Full project management for the completion of tranche 3 of the drinking water supply master plan for the municipality of Faaa – Client: Municipality of Faaa – 2008
- Feasibility study for the Te Noha drinking water supply – Client: Municipality of Faaa – 2008
- Study of the drinking water, industrial water, and wastewater sanitation supply conditions for the golf and hotel project on Motu Tevairoa – Client: SPEA – 2007
ENVIRONMENT
- Preliminary study for the recalibration of the PIAFAU river and the RDC bridge – Client: Department of Public Works – 2025 (ongoing)
- Study on the development of the Bain Loti banks – FAUTAUA – Client: Department of Public Works – 2025 (ongoing)
- Stormwater sanitation plan for the Cité de l’Air – Client: State Civil Aviation Service – 2025
- Hydraulic study for the gutter project on parcel CI72 – MOOREA – Client: Municipality of MOOREA – 2025
- Hydraulic study of the PAPARA town hall road – Client: Terehēamanu Community of Communes – 2025
- Project management for securing the water resource of the FAUTAUA valley – Client: Municipality of PAPEETE – 2025 (ongoing)
- Project management for the development of the HAMUTA river – Tranche 1 (Tender Documents) – Client: Department of Public Works, Infrastructure Subdivision – 2025
- Development of the stormwater sanitation master plan for the municipality of Papeete – Phase 4 – Client: Municipality of PAPEETE – 2024
- Development of the stormwater management and sanitation master plan for the municipality of PUNAAUIA – Phase 3 – Client: Municipality of PUNAAUIA – 2024
- Development of the stormwater sanitation master plan for the municipality of PAEA – Phases 2 and 3 – Client: Municipality of PAEA – 2024
- Project management for studies and works supervision for the reconstruction of 2 culverts – Pueu PK 10.7 and PK 13.1 – Client: Department of Public Works – 2024
- Development of the stormwater management and sanitation master plan for the Terehēamanu community of communes – Phase 1 – Client: Terehēamanu Community of Communes – 2024
- Project management for the development of the HAMUTA river – Tranche 1 (Project design) – Client: Department of Public Works, Infrastructure Subdivision – 2023
- Flood hazard mapping of Tahiti’s rivers via LIDAR – Client: Directorate of Construction and Development – 2023
- Hydraulic study of the POHAIATERA river – Arue PK 6.4 – Client: Department of Public Works, Infrastructure Subdivision – 2023
- Feasibility study for the stormwater sanitation of the JUVENTIN servitude – Client: Municipality of PAPEETE – 2023
- 2D hydraulic modeling for the development of the NYMPHEA – Client: Department of Public Works – 2023
- Preliminary design for the development of the Buillard servitude – Client: Municipality of PAPEETE – 2023
- Road stormwater master plan for the municipality of TAIARAPU OUEST – Client: Department of Public Works – 2023
- Development of the stormwater sanitation master plan for the municipality of Papeete – Phase 3 – Client: Municipality of PAPEETE – 2023
- Development of the stormwater sanitation master plan for the municipality of PAEA – Phase 1 – Client: Municipality of PAEA – 2023
- Development of the stormwater sanitation master plan for the municipality of PUNAAUIA – Phases 1 and 2 – Client: Municipality of PUNAAUIA – 2023
- Development of the stormwater sanitation master plan for the municipality of PAPEETE – Client: Municipality of PAPEETE – 2022 (ongoing)
- Development of the roads in the MANUHOE district – hydraulic study update – Client: Municipality of PAPEETE – 2022
- Project management for the development of the HAMUTA river – Tranche 1 (Preliminary design) – Client: Department of Public Works – Project Cost: 200 MF – 2022
- Project management for the development works of the PIAFAU river (Preliminary design) – Client: Department of Public Works – 2022
- Project management study for the renovation of the VAIAHA storm basins (VISA-DET) – Client: Department of Public Works – Project Cost: 60 MF – 2022
- Project management for the development works of the VAIPOOPOO river (VISA-DET-AOR) – Client: Department of Public Works – Project Cost: 300 MF – 2022
- Project management for the development works of the NYMPHEA river (VISA-DET-AOR) – Client: Department of Public Works – Project Cost: 900 MF – 2022
- Hydraulic study of the Méridien roundabout – Client: Department of Public Works – 2022
- Hydraulic study of the Domaine Rose – Client: Department of Public Works – 2022
- Hydraulic study of the FAARIPO bridge – Client: Department of Public Works – 2022
- Sanitation study for lane L – PAPEETE – Client: Department of Public Works – Project Cost: 100 M FCP – 2021
- Hydraulic study TEFAAITI – Client: Department of Public Works – 2021
- Project management for the rehabilitation of VAIAHA – Client: Department of Public Works – Project Cost: 88 M FCP – 2021 (ongoing)
- Project management for the rehabilitation of C16 – Client: Department of Public Works – Project Cost: 30 M FCP – 2021 (ongoing)
- Hydraulic study on the FULLER district sector in OUTUMAORO – Client: Municipality of PUNAAUIA – Project Cost: 110 M FCP – 2021
- Hydraulic diagnostic of stormwater sanitation structures between PK12.5 and PK13.3 – PUNAAUIA – Client: Department of Public Works – Project Cost: 123.5 M FCP – 2021
- Project management for the creation of the TAHARUU settling basin – Client: Department of Public Works – Project Cost: 150 M FCP – 2021
- Project management for the development of the NAHOATA river – tranche 2 – Client: Department of Public Works – Project Cost: 600 M FCP – 2020
- Project management for the development of the VAIPOOPOO river – Client: Department of Public Works – Project Cost: 160.6 M FCP – 2020
- Project management for the LVT backfilling – Supplementary missions MC1 (Stormwater) and MC6 (Flood Risk Prevention Plan) – Client: G2P – 2020
- Hydraulic study of the culvert at PK 20.9 in PAEA – Client: Department of Public Works – 2020
- Preliminary study for the development of the VAIATU river (OROFERO) – Client: Department of Public Works – Project Cost: 185 M FCP – 2020
- Application for Authorization to Operate a Category 2 and 3 landfill in Hiva OA – Project Owner: Municipality of HIVA OA – 2011
- Application for Authorization to Operate a Category 2 and 3 landfill in Ua Pou – Project Owner: Municipality of Ua POU – 2010
- Environmental diagnostic of the medical waste incineration activity at the NIVEE site – Project Owner: CHT of Mamao – 2010
- Application for Authorization to Operate the Papara green waste composting station – Project Owner: Tahiti Compost – 2010
- Application for Authorization to Operate the emergency generators of the central post office – Project Owner: OPT – 2010
- Application for Authorization to Operate a fuel distribution station – Project Owner: PETROPOL – 2009
- Studies for the dismantling and decontamination of the VAIRAATOA power plant – Project Owner: EDT – 2009
- Application for Authorization to Operate the STDP and SPMU fuel depots – Project Owner: STDP and SPMU (petroleum group) – 2009
- Application for Authorization to Operate a grease treatment unit – Project Owner: Municipality of Bora Bora – 2008
- Application for Authorization to Operate a fuel distribution station in Taiarapu Est – Project Owner: SHELL – 2008
- Application for Authorization to Operate a waste transfer station – Project Owner: Municipality of Bora Bora – 2008
- Environmental impact studies for the PAPEIHA valley dam and hydroelectric plant project – Project Owner: EDT – 2008
- Environmental impact studies for the extension of the PUNAAUIA wastewater treatment plant – Project Owner: Department of the Environment – 2007
- Application for Authorization to Operate a shopping center in Taiarapu Est – Project Owner: SCI Maeva Taravao – 2007
- Monitoring and preparation of the application for the BLUE FLAG label – Project Owner: Municipality of Bora Bora – 2007
- Application for Authorization to Operate the RURUTU power plant – Project Owner: EDT – 2007
- Project management for Faaroa landfill – Client: HAVA’I Community of Communes – Project Cost: 1200 MF – 2025
- Supervision of Ua Huka waste collection center construction – Client: Municipality of Ua Huka – Project Cost: 46 MF – 2024-2025
- Project management for the Punaruu waste collection center – Client: FENUA MA – Project Cost: 300 MF – 2024-2025
- Supervision of renovation works for the Paihoro waste collection center – Client: FENUA MA – Project Cost: 150 MF – 2024
- Creation of two cells at the NUKU HIVA landfill – Client: Municipality of NUKU HIVA – Project Cost: 80 MF – 2023
- Supervision of the dismantling of the old NIVEE medical waste incinerator – Client: DIREN – Project Cost: 25 MF – 2023
- Owner’s assistance for the implementation of a domestic incinerator – Client: HAVA’I Community of Communes – Project Cost: 100 M – 2023
- Project management for the extension of the Bora Bora landfill cells – Client: Municipality of Bora Bora – Project Cost: 30 MF – 2022
- Monitoring of regulatory files and financing applications for FAAROA landfill – Client: HAVA’I Community of Communes – Project Cost: 1000 MF – 2022
- Rehabilitation of the PUNARUU transfer center – Client: FENUA MA – Project Cost: 120 MF – 2022
- Study of the NIVEE incinerator – Client: FENUA MA – Project Cost: 20,000 MF – 2022
- Supervision of works for the replacement of the NIVEE medical waste incinerator – Client: DIREN – Project Cost: 35 MF – 2022
- Project management for the renovation of the Moorea waste collection and transfer center – Client: FENUA MA – Project Cost: 114 MF – 2022-2023
- Preliminary design for a mini waste collection center in PAPARA – Client: FENUA MA – Project Cost: 15 MF – 2020
- Revision of the preliminary project for the FAAROA landfill and regulatory application – Client: HAVA’I Community of Communes – Project Cost: 900 M CFP – 2020
- Project management and impact study for the rehabilitation of the Punaruu dump – Client: Municipality of Punaauia – Project Cost: 90 M CP – 2019-2020
- Full project management for the creation of the buffer dock at Paihoro – Client: FENUA MA – Project Cost: 70 M FCP – 2019-2020
- Preliminary study and design for waste collection and creation of a landfill in Raivavae – Client: Municipality of Raivavae – Project Cost: 400 M FCP – 2017–2020
- Preliminary design for a waste collection center in the PUNARUU valley – Client: FENUA MA – Project Cost: 170 M FCP – 2018
- Feasibility follow-up for a green waste shredding platform at Punaruu – Client: Fenua Ma – Project Cost: 70 M FCP – 2018
ENERGY AND INDUSTRY
- Technical-economic study for the relocation of Taunoa oil depots – Client: G2P – 2024 (ongoing)
- Installation of a diesel distribution network at the PAP schooner docks – Preliminary studies – Client: STDO – 2024
- Creation of the SPMU oil depot at Motu Uta: Owner’s Assistance – Client: SPMU – Tahiti – 2019
- PAPEETE wastewater treatment plant: All trades, full project management – Client: SEM Te Ora No Ananahi – Project Cost: 1.5 billion CFP – 2014-2016
- Extension of STDP oil depot at Motu Uta: Design project management – Client: STDP – Project Cost: 1.7 billion CFP – 2009-2014
- Creation of SPMU oil depot at Motu Uta: Design project management – Client: SPMU – Project Cost: 1.8 billion CFP – 2009-2014
- AVGAS depot in the north zone of Tahiti Faa’a airport: Design project management – Client: PETROPOL – 2013
- Mobil station in Taravao: Design project management – Client: SERMODIS – 2012–2013
- Marine diesel distribution station at Motu Uta: Full project management – Client: STDO – 2010
- Extension of SOMSTAT depot at Tahiti Faa’a airport: Preliminary studies – Client: SOMSTAT – 2009
- Creation of a drumming area at Motu Uta: Preliminary studies – Client: STDP – 2009
- Extension of PETROPOL depot in Bora-Bora: Design project management – Client: PETROPOL – 2009
- Creation of a lighting system – Hao Airfield – Client: Department of Public Works – SAT – 2024 (ongoing)
- Renovation of public lighting equipment in Mahina, phase 2 – Client: Municipality of Mahina – Project Cost: 48 M FCP – 2023 (ongoing)
- Creation of a lighting system – Anaa Airfield – Client: Department of Public Works – SAT – Project Cost: 200 M FCP – 2019-2023
- Renovation of public lighting equipment in Papeete – Phase 3 – Client: Municipality of Papeete – Project Cost: 100 M FCP – 2019-2022
- Renovation of public lighting equipment in Mahina – Client: Municipality of Mahina – Project Cost: 38 M FCP – 2019-2022
- Creation of a lighting system – Tikehau Airfield – Client: Department of Public Works – SAT – Project Cost: 321 M FCP – 2019 (ongoing)
- Creation of a lighting system – Manihi Airfield – Client: Department of Public Works – SAT – 2019 (ongoing)
- Development of an international airport in Nuku-Hiva and Rangiroa – Preliminary design studies – Client: Civil Aviation Directorate – 2021 (ongoing)
- Renovation of public lighting equipment in Taiarapu Ouest – Client: Municipality of Taiarapu Ouest – Project Cost: 36 M FCP – 2019-2020
- Renovation of public lighting equipment in Taiarapu Est – Client: Municipality of Taiarapu Est – Project Cost: 124 M FCP – 2019-2020
- Renovation of public lighting equipment in downtown Papeete – Client: Municipality of Papeete – 2018-2020
- Renovation of public lighting equipment in downtown UTUROA – Client: Municipality of Uturoa – 2018-2020
- Renovation of public lighting equipment on the RDO – RDP – Client: Department of Public Works – Project Cost: 380 M FCP – 2017-2018
- General diagnostic of public lighting in the City of Papeete – Client: Municipality of Papeete – 2017
- Renovation of public lighting equipment in the municipality of PIRAE – Phase 2 – Client: Municipality of Pirae – Project Cost: 30 M FCP – 2014-2017
- Creation of the lighting system for MAKEMO airfield – Client: Department of Public Works – SAT – Project Cost: 119 M FCP – 2014-2017
ELECTRICITY GENERATION
- Hybrid photovoltaic-thermal power plant in Tahaa – Preliminary studies – Client: SPL Te Uira Api No Te Mau Motu – 2025 (ongoing)
- Hybrid photovoltaic-thermal power plant in Raiatea – Preliminary studies – Client: SPL Te Uira Api No Te Mau Motu – 2025 (ongoing)
- Hybrid photovoltaic-thermal power plant in Huahine – Project management – Client: SPL Te Uira Api No Te Mau Motu – 2023 (ongoing)
- Installation of photovoltaic generation on municipal buildings in Huahine, Tahaa, Taputapuatea, Tumara’a, and Rurutu – Project management – Client: SPL Te Uira Api No Te Mau Motu – 2023 (ongoing)
- Creation of a hybrid power plant in the Vaitahu valley on the island of Tahuata – Preliminary design – Client: CODIM – 2023
- Hybrid photovoltaic-thermal power plant in Uturoa – Project management – Client: Municipality of Uturoa – 2021 (ongoing)
- Electrification of the island of Maiao. Generation via hybrid photovoltaic-thermal plant. – Design studies – Client: Municipality of Moorea-Maiao – 2020-2023
- Photovoltaic generation on the archives service building – Project management – Client: Department of Energy – Project Cost: 12.7 M FCP – 2020-2021
- Photovoltaic generation on the technical services buildings of the Municipality of Arue – Project management – Client: Municipality of Arue – Project Cost: 2.8 M FCP – 2019–2024
- Uturoa photovoltaic power plant – Feasibility studies and design assistance – Client: Municipality of Uturoa – 2019–2020
- Taputapuatea photovoltaic greenhouse, Owner’s Assistant – Client: Municipality of Taputapuatea – 2019–2020
- Photovoltaic generation on the Uturoa fire station, Full project management – Client: Municipality of Uturoa – Project Cost: 19.4 M FCP – 2019–2020
- Photovoltaic generation on the fishing cooperatives of Tahiti and Moorea – Full project management – Client: DRMM – Project Cost: 11.6 M FCP – 2018-2020
- Hybrid power plant with storage in Tatakoto, Feasibility studies, administrative files – Client: Municipality of Tatakoto – 2018–2019
- Photovoltaic generation on CFPA buildings, Full project management – Client: CFPA – Project Cost: 28 M FCP – 2017–2018
- Photovoltaic generation on the buildings of the Municipality of Taiarapu Est: Feasibility studies, project management – Client: Municipality of Taiarapu Est – Project Cost: 19 M FCP – 2016-2019
- Photovoltaic generation on the country’s administrative buildings: Full project management – Client: Department of Energy – Project Cost: 40 MF – 2015-2017
ELECTRICITY DISTRIBUTION AND TRANSMISSION
- Creation and extension of the 30kV substations of Vaihiria and Titaaviri – Project management – Client: TEP – Project Cost: 200 MF – 2021–2025
- Creation of the 90kV and 30kV substations of Papenoo Aval, Arue, and Faatautia – Owner’s assistance – Client: TEP – Project Cost: 1200 MF – 2019–2025
- Renewal of the 90kV and 30kV links TEP2 and TEP3 – Project management – Client: TEP – Project Cost: 1200 MF – 2019–2024
- 90kV link Tiparui – Arue – Project management – Client: TEP – Project Cost: 500 MF – 2018–2024
- 90kV overhead-underground link, Faatautia valley – Project management – Client: TEP – Project Cost: 500 MF – 2018–2024
- Renovation of the Uturoa HV/LV network, transition to 20kV underground, tranche 2 – Full project management – Client: Municipality of Uturoa – 2017–2020
- Extension Vaihoroe: Full project management – Client: Municipality of Uturoa – 2017
- 90kV link TIPA – ARUE Prince Hinoi section – Project management – Client: TEP – Project Cost: 145 MF – 2016
- 90kV link Papenoo aval – Faatautia – Design studies – Client: TEP – Project Cost: 500 MF – 2015-2016
- Renovation of the Uturoa downtown HV/LV network, transition to 20kV underground – Full project management – Client: Municipality of Uturoa – Project Cost: 300 M – 2015-2017
Electrical Energy Master Plan
- Electrical energy master plan for the municipality of Rurutu – Client: Municipality of Rurutu – 2024
- Electrical energy master plan for the municipality of Tahaa – Client: Municipality of Tahaa – 2023
- Electrical energy master plan for the municipalities of Taputapuatea and Tumaraa – Client: Municipalities of Taputapuatea and Tumaraa – 2023
- Electrical energy master plan for the municipality of Huahine – Client: Municipality of Huahine – 2021
- Assistance for the transfer of the public service delegation contract for electricity distribution for the Municipalities of Taputapuatea, Tumaraa, Huahine, Tahaa, and Rurutu – Client: Municipalities of Taputapuatea, Tumaraa, Huahine, Tahaa, and Rurutu – 2020-2021
- Asset inventories and management model studies for the public service delegation of electricity distribution for the Municipality of Rurutu – Client: Municipality of Rurutu – 2020
- Asset inventories of the electricity distribution service for the Municipality of Tahaa – Client: Municipality of Tahaa – 2020
- Assistance for the transfer of the public service delegation contract for electricity distribution of SECOSUD – Client: SECOSUD – 2020
- Control of the public service delegation for electricity distribution of SECOSUD – Client: SECOSUD – 2019-2020
- Management model studies for the public service delegation of electricity distribution for the Municipalities of Taputapuatea, Tumaraa, Huahine, and Tahaa – Client: Municipalities of Taputapuatea, Tumaraa, Huahine, and Tahaa – 2018
- Assistance for the transfer of the public service delegation contract for electricity distribution of SECOSUD – Client: SECOSUD – 2016
- Audit of the public service concession contract for electricity distribution of SECOSUD, comparison of management models – Client: SECOSUD – Tahiti – 2013
- Energy audit of municipal buildings – Client: Municipality of Paea – 2021
- Energy audit of municipal buildings – Client: Municipality of Mahina – 2021
- Energy orientation consulting for the Municipality of Taputapuatea – Client: Municipality of Taputapuatea – 2019-2020
- Electrical instrumentation of the buildings of the Municipality of Huahine – Client: Municipality of Huahine – 2019-2020
- Energy Orientation Consulting for the Municipality of Bora Bora – Client: Municipality of Bora Bora – 2017
- Energy Orientation Consulting for the Municipality of Tahuata – Client: Municipality of Tahuata – 2017
- Implementation of collective wastewater sanitation for the city of Papeete – Wastewater treatment plant – Full project management (Design-build contract) – Client: SEM TE ORA NO ANANAHI – Papeete – Project Cost: 1.5 billion CFP – 2012
- MAEVA NUI shopping center: all trades – Full project management – Client: SCI Maeva – Taravao – Project Cost: 1.5 billion CFP – 2008 – 2012
- Pre-diagnostic energy audit of the High Commission’s buildings – Client: ADEME – Papeete – Project Cost: N/A – 2010
- Banque de Tahiti building in Punaauia – Design and supervision of high and low voltage works, 100kVA backup generator – Client: Banque de Tahiti – Punaauia – 2007
- Punaauia fire station building – Design and supervision of high and low voltage works, 10kVA backup generator – Client: Municipality of Punaauia – 2007
- Electrical compliance of the CFPA of PIRAE and PUNARUU – Design and supervision of high and low voltage works – Client: CFPA – 2006
- Papeete schools – Design and supervision of works to bring electrical installations up to standard – Client: Municipality of Papeete – 2002 – 2005
- Development of the Arue motu – Design and supervision of fluid works: High and low voltage, air conditioning, smoke extraction, ventilation, sanitation (wastewater/rainwater), plumbing, emergency systems, fire safety, earthworks, and external works – Surface area 2000 m² – Client: Municipality of Arue – 2005
- EDT power plant in Bora-Bora – Design and supervision of building works, all trades – Surface area: 500 m² – G+1 – Client: EDT – 2005 – 2007
CONSULTING, OWNER’S ASSISTANCE, MASTER PLANS, AND PROSPECTIVE STUDIES
SPEED has carried out several owner’s assistance missions for the organization of public interest operations and the operation of public services in the fields of drinking water, wastewater sanitation, and waste. These missions involve analysis and support at various stages:
- Consultation,
- organizational methods,
- evaluation of projected management costs for facilities,
- service pricing studies,
- comparative analysis of contract types and procurement methods,
- drafting of contracts,
- assistance with contract award and negotiation.
OWNER’S ASSISTANCE
- Owner’s assistance for the “local agricultural product processing plant” project on the island of Raiatea (institutional, technical, and agricultural sector consultation, assistance in determining the operational setup) – Client: HAVA’I Community of Communes – 2014
- Owner’s assistance for the Mahana Beach development project on the island of Tahiti (development of specifications for definition studies, assistance in determining the contracting procedure with a private investor) – Client: Tahiti Nui Aménagement et Développement (Public Establishment) – 2014
- Owner’s assistance for the creation of wells in Terre Déserte (Department of Public Works) – 2011
- Owner’s assistance for the award of the operating contract (leasing) for the Pirae drinking water supply network – Client: Municipality of Pirae – 2013
- Owner’s assistance for the award of the operating contract (leasing) for the collective wastewater sanitation infrastructures (network, station) of Bora Bora – Client: Municipality of Bora-Bora – 2012
- Waste management of HAO – Financial and legal study of the “waste” public service – Financing file for the project contract – Client: Municipality of HAO – Project lead: High Commission of French Polynesia – DIPAC – 2011
- Owner’s assistance for the award of the operating contract (leasing) for the industrial water infrastructures (network, station) of Bora Bora – Client: Municipality of Bora-Bora – 2011
- Owner’s assistance for the award of the public service delegation contract for the operation of the Bora Bora green waste composting station – Client: Municipality of Bora Bora – 2011
- Waste management of Hiva OA – Financial and legal study of the “waste” public service – Financing file for the project contract – Client: Municipality of Hiva Oa – Project lead: High Commission of French Polynesia – DIPAC– 2011
- Owner’s assistance for the award of the operating contract (leasing) for the collective wastewater sanitation infrastructures (network, station) of HAAPITI in MOOREA – Client: Municipality of Moorea – 2010
- Waste management of Ua Pou – Financial and legal study of the “waste” public service – Financing file for the project contract – Client: Municipality of Ua Pou – Project lead: High Commission of French Polynesia – DIPAC – 2010
- Technical assistance to the Ministry of the Environment for the management of category 1 waste from NIVEE – Client: Ministry of the Environment – 2009
- Analysis and proposal for improving the pricing of the household and similar waste collection and treatment system of the Municipality of Arue – Client: Municipality of ARUE – 2009
- Drafting of Tenders for the operation of the BORA BORA landfill – Client – Municipality of BORA BORA – 2009
- Analysis of the management mode for the operation of the Nuku Hiva landfill – Client – Ministry of the Environment – 2008
- Analysis of management modes – drafting of tenders for the operation of the collection of medical waste from public care units – Project Owner: Ministry of Health – 2007 – 2006
- Analysis of management modes – drafting of tenders for the operation of the incineration units and the category 1 landfill of NIVEE – Project Owner: Ministry of the Environment – 2007 – 2006
- Technical assistance to the territory of French Polynesia for the leasing of the network and wastewater treatment plant of FAANUI in BORA-BORA – Client: Municipality of Bora Bora – 2005
- Technical assistance to the municipality of MOOREA for the leasing of the drinking water service – Client – Municipality of Moorea – 2005
MASTER PLAN / MANAGEMENT PLAN
- Wastewater Sanitation Master Plan for the Municipality of Bora Bora (Municipality of BORA BORA) – 2013
- Update of the Wastewater Sanitation Master Plan for the municipality of FAAA (Municipality of FAA’A) – 2012
- Wastewater sanitation master plan for Papeete (SEM TE ORA NO ANANAHI) – 2008
- General stormwater sanitation plan for the PUNAAUIA – PAEA plain PK 17 to 20 – Project Owner: DEQ – Project Cost: 550 M FCP HT – 2010
- General Sanitation Plan for VAIPOOPOO – Preliminary Study – Project Owner: DEQ – Project Cost: 62 M FCP HTVA – 2009
- Owner’s assistance for the execution of two regulation basins (50,000 m3 and 7,000 m3) on the VAIAHA, FAA’A – Project Owner: DEQ – 2008
- Stormwater Master Plan for TAIARAPU EST, Municipality of TAIARAPU-EST – 2005
- Stormwater Master Plan for PAPEETE, Municipality of PAPEETE – 2005
- Sanitation Master Plan for RT 2 in MAHINA – PK 9 to PK 12.5 – Department of Public Works – 2005
- Update of the drinking water master plan for the municipality of PAEA – 2015
- Update of the drinking water supply master plan for the municipality of Taiarapu Est – Project management for short-term drinking water supply works in the sectors of Afaahiti and Faaone-Est (Taiarapu Est) – 2011
- Update of the drinking water master plan for the municipality of Uturoa (Uturoa) – 2010
- Update of the drinking water master plan for the municipality of Pirae (Pirae) – 2010
- Update of the master plan for the municipality of Papara (Municipality of Papara) – 2009
- Update of the drinking water master plan for the Municipality of Arue (Municipality of Arue) – 2008
- General study – Drinking Water Supply Master Plan for the municipality of Bora Bora (Vaitehi) – 2007
- Master plan to 2020 for the generation, transmission, AND distribution for the island of TAHITI – EDT, TEP, MARAMA NUI – 2002 – 2003
- Study on FENUA MA becoming a public utility – Client: FENUA MA – 2025
- Study on the implementation of a household waste incinerator at the NIVEE site – Client: FENUA MA – Project Cost: 25,000 MF – 2022-2025
- Research and feasibility studies for landfills on the islands of Huahine, Maupiti, and Tahaa – Phase 2 – Feasibility study of landfills – Client: HAVA’I Community of Communes – Project Cost: 3400 MF – 2024
- Renovation of the MOOREA Transfer Center – Client: FENUA MA – Project Cost: 200 MF – 2024
- Municipal waste management plan for the Municipality of FAKARAVA – phases 3 and 4 – Client: Municipality of Fakarava – 2023
- Municipal waste management plan for the Municipality of TAIARAPU EST – Client: Municipality of Taiarapu Est – 2023
- Update of the Municipal waste management plan for the HAVA’I Community of Communes – Client: HAVA’I Community of Communes – 2022
- Update of the operating plan for the NUKU HIVA landfill – Client: Municipality of NUKU HIVA – 2022
- Municipal waste management plan for the Municipality of Paea – Client: Municipality of Paea – 2022-2023
- Municipal waste management plan for the Municipality of Teva I Uta – Client: Municipality of Teva I Uta – 2022-2023
- Municipal waste management plan for the municipality of Rangiroa – Client: Municipality of Rangiroa – 2021-2022
- Municipal waste management plan for the municipality of Rurutu – Client: Municipality of Rurutu – 2021-2022
- Site search for the transfer and recycling center and sketch – Client: FENUA MA – 2020
- Study on Waste and Effluent Management at the Class II Slaughterhouse of Raiatea – Client: DEPARTMENT OF AGRICULTURE – 2020
- Research and feasibility studies for landfills on the islands of Huahine, Maupiti, and Tahaa – Client: HAVA’I Community of Communes – 2018-2019
- Study on Waste Management at the Tahiti Slaughterhouse – Client: DEPARTMENT OF AGRICULTURE – 2018-2019
- Master Plan for waste treatment processes – Client: FENUA MA – 2019
- Dismantling study of the Motu Uta Recycling and Transfer Center – Client: FENUA MA – 2019
- Pricing outlook for the waste collection center network – Client: FENUA MA – Project Cost: 1,019,856 F CFP – 2017
- Preliminary design for the FAAROA landfill – Client: HAVA’I Community of Communes – Project Cost: 1,200 M CFP – 2017
- Feasibility study for the creation of a category 2 and 3 landfill in the Municipality of Moorea-Maiao – Phases 3 and 4 – Feasibility study and management methods – Client: FENUA MA – Project Cost: 1,000 M FCP – 2017
- Preliminary design for the renovation of FENUA MA infrastructures – Client: FENUA MA – Project Cost: 270 M FCP – 2017
- Design project management for the Ua Pou landfill and waste collection center – Client: Municipality of Ua Pou – Project lead: High Commission of French Polynesia – DIP – Project Cost: 300 M FCP – 2016 – 2017
- Expansion works for the Bora Bora landfill – Client: Municipality of Bora Bora – Project Cost: 200 M FCP – 2016 – 2017
- Opportunity study for the transfer of green waste “treatment” competence from municipalities to FENUA MA – Phases A and B – Client: FENUA MA – 2016 – 2017
- State of the art of waste treatment and recovery processes and master plan – Phases A and B – Client: FENUA MA – 2016 – 2017
- Development of a network of waste collection centers in the FENUA MA territory – Phases A, B, and C – Client: FENUA MA – 2015 – 2017
- Opportunity study for the transfer of “collection” competence from municipalities to FENUA MA – Phases A, B, and C – Client: FENUA MA – 2015 – 2017
- Owner’s assistance for the award of the operating contract for the category 2 and 3 landfill of Bora Bora – Client: Municipality of Bora Bora – Project Cost: 3,506,350 F CFP – 2015 -2017
- Waste management plan for the Municipality of Papara – Client: Municipality of Papara – 2017
- Waste management plan for the HAVA’I Community of Communes – Client: HAVA’I Community of Communes – 2016 -2017
- Waste management for the municipality of Ua Huka – Client: CODIM – 2015
- Waste management for the municipality of Hao – Client: Municipality of Hao – 2013
- Waste management for the municipality of Ua Pou – Client: Municipality of Ua Pou – 2011
- Waste management for the municipality of Hiva OA – Client: Municipality of Hiva Oa – 2011
- Plan for the recovery and disposal of household and similar waste in Faa’a – phase 1 “Evaluation of the collected and treated deposit” – Project Owner: Municipality of FAA’A – 2007
- Plan for the recovery and disposal of household and similar waste in Faa’a – phase 2 “Technical analysis of the sector and implementation site” – Project Owner: Municipality of FAA’A – 2008
- Undergrounding of dry and wet networks on the island of Bora Bora – tranche 2 – Project – Tender Documents – Etablissement des Grands Travaux – 2007
- Undergrounding of dry and wet networks on the island of Bora Bora – tranche 1 – Project – Tender Documents – Etablissement des Grands Travaux – 2007
- Development of the access road to the three waterfalls – Feasibility – Preliminary Design – Department of Public Works – Infrastructure Division – 2006
- Development of rue Pierre LOTI tranche 1 and 2 – Project phase / Tender Documents – Earthworks, roadway, stormwater sanitation network – Department of Public Works – Infrastructure Division – 2005
- Project management for the development of PUNAAUIA roads – Creation of a new route and development of 4 servitudes – Roads, earthworks, stormwater sanitation, drinking water network repair – Municipality of PUNAAUIA – 2005
- Development of rue du REGENT PARAITA – Project Owner: Municipality of Papeete – Diagnostic of the stormwater sanitation network, proposals for sanitation solutions, and repair of the surface layout (sidewalks, roads) – 2003
- Preliminary design, project, and “networks” tender documents for the design of the Grand VAIETE development (road underpass, parking, and surface development) in partnership with the SCETAUROUTE design office (lead). Construction of the pumping station and network relocations. – Project Owner: Etablissement des Grands Travaux – 2003
- Diagnostic and programming of the renovation of municipal roads – Project Owner: Municipality of FAA’A – Diagnostic of roads, development proposals, establishment of a multi-year work program, and implementation of a monitoring tool using a database crossed with a geographic information system. – 2003
- Preliminary design for the future PRINCE HINOI road underpass in partnership with the SCETAUROUTE design office (lead) – Project Owner: Ministry of Public Works – Construction of the pumping station, network relocations, public lighting. – 2002
- Lead of the partnership with the Mercier firm for the design of the Outumaoro coastal development – Project Owner: Ministry of Tourism, Project lead: Department of Public Works. Creation of a maritime embankment and a recreational and tourist surface development. – 2002
- Preliminary summary design of the West Papeete-Taravao link in partnership with the design offices SEDEP (lead) / SCETAUROUTE / THALES. – Project Owner: Ministry of Public Works – Creation of a new road route from PK15 in Punaauia to Taravao. – 2002
- Design project management for the servicing of the waste treatment complex on the NIVEE site – Project Owner: Ministry of the Environment – Project lead: Ministry of Public Works: earthworks, roads and platforms, safety equipment, stormwater sanitation, drinking water network, electricity, and telephone – 2001
- Design project management for the Outumaoro interchange in partnership with the SCETAUROUTE design office (lead) – Project Owner: Ministry of Public Works – Network relocations, public lighting – 2001
- Design project management for the BOUNTY underpass in partnership with the SCETAUROUTE design office (lead) – Project Owner: Ministry of Public Works – Construction of the pumping station, network relocations, public lighting, diversion of the watercourse via a canal at a depth of –8.00 m – 2000
- Design project management for the widening of the RDO at the entrance to Papeete in partnership with the SCETAUROUTE design office (lead) – Project Owner: Ministry of Public Works – Network relocations, public lighting – 2000
- Design project management for the PUNARUU bridge in partnership with the SCETAUROUTE design office (lead) – Project Owner: Ministry of Public Works – Network relocations, public lighting. – 2000
- Studies and preliminary designs for a waste treatment complex on the NIVEE site (Ministry of the Environment): creation of earthwork plans for the access road, tracks, platforms, and class 1 cells. – 2000
- Preliminary design for the creation of a landfill on the island of Nuku-Hiva – 60,000 m3 of earthworks
- “Networks” project management for the UTUROA 2000 project. Complete overhaul of the city center networks (Drinking water, Wastewater and stormwater sanitation, Electricity, Public lighting) – 1999
- Design project management for the treatment of terrestrial discharges from the Nymphéa river – 7 m high dike and creation of a 10,000 m3 storage basin – 1999
- Project management and hydraulic modeling for the diversion of the Vaiami watercourse – creation of a block trap, earthworks: 6,000 m3 – 1999
- Full project management for the diversion of the watercourses of the Paihoro landfill in Tahiti – Creation of diversion channels and service tracks – 80,000 m3 of earthworks – 1998
- Full project management for the creation of the access road and tracks, 3 cells, platforms, networks, and technical equipment of the Paihoro landfill (SEP) – 120,000 m3 of earthworks – 450 MF of works – 1998
- C18/C19 regulation basin – Project level study – Basin design, earthworks 50,000 m3 – 1998